salriel / systemsPlan a project ↗
Equipment · infrastructure · installation

Technology,
working
together.

Cameras, networks and access control work as one system. Explore what your site needs, how to prepare for installation and what to check at handover.

Video surveillanceCabling & Wi-FiAccess control
DIAGRAM / 01SITE INFRASTRUCTURE
IP CAMERAWI-FIACCESSCONTROLLERNETWORK CABINET
CABLING / POWER / CONTROLSALRIEL
01Start with the brief and site plan
02Choose compatible equipment
03Test the complete system
Three core systems

The foundation of
a working space.

A single device handles a single task. Good infrastructure connects devices, power and control in a system that is easy to understand.

Video surveillance

Cover entrances, checkouts, corridors and boundaries. Choose each camera for its scene: distance, lighting and the level of detail you need.

  • IP cameras and suitable lenses
  • Recorders and storage drives
  • PoE power and remote viewing
Camera selection checklist ↗

Cabling & Wi-Fi

Wired connections for workstations and wireless coverage for people and devices. Layout and concurrent users matter more than the number of antennas.

  • Twisted pair, fibre and data outlets
  • Switches and access points
  • Business, guest and device networks
Explore network equipment ↗

Access control

Who can enter, where and when. Access control combines readers, controllers and door hardware, while an intercom adds communication with visitors.

  • Cards, tags and user permissions
  • Locks, turnstiles and entry points
  • Event logs and access rules
Plan the installation ↗
Building the specification

More than cameras
and boxes.

Connections matter as much as devices. Include cabling, power, cabinets and installation materials before placing an order.

VIDEO

Cameras and lenses

Field of view, detail in the target area, low-light performance and installation conditions. An entrance and a distant boundary need different solutions.

STORAGE

Recorders and drives

Channel count, incoming bandwidth, camera compatibility and retention time. Check how easily recordings can be found, as well as whether they are being saved.

NETWORK

Switches and routers

Ports for current devices and expansion, total PoE budget, uplink capacity and options for separating network traffic.

COVERAGE

Wi-Fi access points

Plan around walls, neighbouring networks and demand. Several well-positioned access points are often more useful than one running at maximum power.

INSTALLATION

Cabling and cable management

Cable suited to its environment, connectors, patch panels, fixings and labels. A cable route plan helps you trace a connection without dismantling the cabinet.

POWER

Cabinets, power supplies and UPS

Space for equipment, ventilation and maintenance access. Size backup power for the actual load and the required runtime.

Typical applications

One approach.
Different sites.

The equipment changes with the task. Choose a site type to see where the planning conversation should begin.

01 / Workspace

Keep teams connected,
manage entry.

Start with a plan of desks, meeting rooms and technical spaces. Establish how many staff and visitors will use the network at the same time.

  • Wired connections for fixed equipment, with spare cable runs.
  • Wi-Fi with separate guest access and verified coverage.
  • Access permissions by room and working schedule.
  • Cameras at entrances and in agreed shared areas.
From plan to operation

Installation starts
before the first hole.

A site survey and working drawings help everyone agree on the result before work begins, reducing corrections after installation.

01 / SURVEY

Define the task

Gather plans, photos and use cases. Check existing cabling, power, mounting locations and site access restrictions.

02 / PREPARATION

Agree the scope

Prepare a system diagram, equipment specification and scope of work. Agree cable routes, connection points, project stages and acceptance criteria.

03 / INSTALLATION

Install and configure

Run and label cables, then install devices. Configure the network, recording, user permissions and required integrations.

04 / HANDOVER

Verify the result

Test the agreed use cases. Hand over drawings, equipment lists, instructions, configuration backups and credentials to the responsible person.

Planning tool

How much storage
will you need?

Estimate continuous recording storage from camera count, average bitrate and retention time. Use the result to discuss recorder capacity before buying drives.

Enter the average bitrate of one camera. Resolution alone does not determine storage needs: codec, frame rate, scene and quality settings also matter.

Estimate with 20% headroom5.81 TBRecording: 4.84 TB · total bitrate: 32 Mbps.
Decimal TB: 1 TB = 10¹² bytes. Headroom is an estimate; allow separately for RAID, audio, overhead and recorder limits. Event-based recording is not modelled here.
Practical guides

Details worth
checking.

A few questions before purchase and installation are often more useful than a long list of product specifications.

Video / camera selection

Wide views and fine detail
are different tasks.

A wide angle can show the whole room, but does not guarantee clear detail at a distance. For each camera, define what must be visible and how far away it will be.

Questions to ask before choosing
  • Do you need an overview or clear detail in a particular area?
  • Is there backlighting, deep shadow or movement?
  • What does the scene look like at night and as lighting changes?
  • Can the camera be reached for maintenance?
Network / power

PoE needs ports
and a power budget.

The number of PoE ports does not tell you how many devices a switch can power at full load. Compare total demand, supported standards and available power.

What to check in the specification
  • Power requirements of every camera and access point.
  • Consumption with illumination and additional features enabled.
  • The switch power budget and room for future devices.
  • Which parts of the system must keep running on UPS power.
Wi-Fi / acceptance checks

Full signal bars
are only the start.

Check coverage alongside throughput and connection stability. Walk the actual routes with the devices that staff will use.

What to include in testing
  • Meeting rooms, distant desks and spaces behind partitions.
  • The load from multiple simultaneous connections.
  • Roaming between access points while moving.
  • Isolation of the guest network from business resources.
Operation / documentation

Labels save time
after installation.

Each outlet label should match the drawings and the corresponding port. When a device stops responding, clear documentation helps locate the right cable and connection.

Essential handover documents
  • Equipment layout and cable identifiers.
  • A table of ports, connections and network addresses.
  • Configuration backups and recovery instructions.
  • A guide to routine tasks for the person responsible.
Acceptance checklist

Check together
with the installer.

  • Camera views and focus
  • Recording, search and export
  • Connectivity in agreed areas
  • User access permissions
  • Labels and up-to-date drawings
  • Recovery after a restart
Common questions

Before work
begins.

Can existing equipment be reused?

Often, yes. First check its condition, compatibility, access to settings and suitability for the new task. A survey will show what can stay and what should be replaced.

Why is floor area alone not enough for a quote?

Cable route length and accessibility, wall materials, mounting heights, device counts and site conditions all affect the work. Plans and photos make the scope easier to assess.

Can installation take place in an occupied office or shop?

Agree the work schedule with the site manager. Plan noisy tasks, network changes and temporary outages separately to accommodate normal operations.

Should future expansion be planned from the start?

Yes, where growth is expected. Spare ports, cabinet space and additional cable runs are often easier to provide during installation. Choose the allowance to match likely needs.

How should an installation proposal be assessed?

Compare the equipment specification, scope of work, timescale and acceptance criteria. Check who supplies the materials, configures the system and provides the handover documents. Clear responsibilities make proposals easier to compare.

Next step

A good solution starts
with a clear brief.

Clear requirements lead to better equipment choices. Describe what needs to change at the site and put together a short project brief.